欧美色色色|午夜爽爽爽男女免费观看一区二区|18禁肉肉无遮挡无码网站|欧美精品在线 ,久久久久久岛国_97精品国产自产_亚洲日韩国产一区_久久香蕉国产线看观看亚洲小说

石化設(shè)計成功案例
成功案例 ? 項目列表
Shandong Shenda Chemical Co.,Ltd. MTO Catalyst Dust Extration Project

Lanke Provides fresh catalyst tanks top dust extration system for Fund Energy Changzhou Co.,Ltd 300,000 MT/YR Polypropylene(PP) Project 1,000,000 MT/YR Methanol-to-Olefins (DMTO) unit. With LPEC as  the general contractor, the afford scope of Lanke included instruments and control systems, pipes and  pipe fittings,installation, training and guidance of stat-off and debugging, and the dust extration will be put into operation in May 15th, 2015.







POWERED BY 上海藍科 COPYRIGHT?2010 - 2014 滬ICP備05062916號

部分圖片和文章來源于網(wǎng)絡(luò),如有侵權(quán)請聯(lián)系刪除